Changes between Version 42 and Version 43 of TBR/UserApp/MMS_Instruments_Suite
- Timestamp:
- 12/06/11 02:21:36 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
TBR/UserApp/MMS_Instruments_Suite
v42 v43 136 136 The ER-2 MMS last performed in January-March 2000 during the Sage Ozone Loss Validation Experiment. The instrument is flight ready and only needs installation on to the CAMEX-4 ER-2 payload. Because the CAMEX payload utilizes a special nose for the ER-2 Doppler Radar (EDOP), the MMS temperature sensors and airflow angle system need to be installed. We have made a preliminary assessment with the ER-2 Engineering Technical Lead at Dryden Flight Research Center. 137 137 = URLS = 138 139 [http://www.nasa.gov/ Official site of NASA] 140 [http://mms.gsfc.nasa.gov/ MMS in the official site of NASA]