TBR/UserApp/MMS_Instruments_Suite
v41 v42 135 135 136 136 The ER-2 MMS last performed in January-March 2000 during the Sage Ozone Loss Validation Experiment. The instrument is flight ready and only needs installation on to the CAMEX-4 ER-2 payload. Because the CAMEX payload utilizes a special nose for the ER-2 Doppler Radar (EDOP), the MMS temperature sensors and airflow angle system need to be installed. We have made a preliminary assessment with the ER-2 Engineering Technical Lead at Dryden Flight Research Center. 137 = URLS =