Changes between Version 41 and Version 42 of TBR/UserApp/MMS_Instruments_Suite


Ignore:
Timestamp:
12/06/11 02:18:00 (12 years ago)
Author:
Ivaylo
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • TBR/UserApp/MMS_Instruments_Suite

    v41 v42  
    135135
    136136The ER-2 MMS last performed in January-March 2000 during the Sage Ozone Loss Validation Experiment. The instrument is flight ready and only needs installation on to the CAMEX-4 ER-2 payload. Because the CAMEX payload utilizes a special nose for the ER-2 Doppler Radar (EDOP), the MMS temperature sensors and airflow angle system need to be installed. We have made a preliminary assessment with the ER-2 Engineering Technical Lead at Dryden Flight Research Center.
     137= URLS =