wiki:Projects/GSoC/TestSuite/conversion_plan

Version 2 (modified by Xiaochen Pan, on 08/23/12 at 04:46:28) (diff)

/* Test Conversion Map */

TestSuite/conversion plan

Test Conversion Map

The following is a list of links to the test map for each area. = Tasks Management =

File Systems

Memory Management

General Areas

Device IO

Network?

=Timing Tests =

A excel formated file is shared via this link: https://docs.google.com/file/d/0Bxu322xUf-v9WVAzOTRYRE53ZjQ/edit

The red item in the file indicates the written tests that is not included in the map.