Version 6 (modified by Xiaochen Pan, on 08/20/12 at 09:59:27) (diff) |
---|
TestSuite
Test Suite Plan
The new test suite is structured as the following table shows: {| class="wikitable"
! width="200pt"|Top Level ! width="300pt"|Areas ! width="300pt"|Directory
|rowspan="6"|Hardware Independent |Tasks(Threads) Management |
|Memory Management |
|File Systems |
|General Area |
|Network |
|Timing Tests |
|rowspan="6"|CPU Dependent |Tasks(Threads) Management |
|Memory Management |
|File Systems |
|General Area |
|Network |
|Timing Tests |
|rowspan="6"|BSP Dependent |Tasks(Threads) Management |
|Memory Management |
|File Systems |
|General Area |
|Network |
|Timing Tests |
|rowspan="6"|Peripheral Dependent |Tasks(Threads) Management |
|Memory Management |
|File Systems |
|General Area |
|Network |
|Timing Tests |
|}
Test Conversion Map
The following is a list of links to the test map for each area. = Tasks Management =
File Systems
Memory Management
General Areas
=Device IO =
==Network?==
===Timing Tests===